Companies usually have to pay about 3,000 VND / kWh of electricity during peak hours, the cost of electricity is very high, so the plan to implement rooftop solar power is attracting companies. With the investment of 1MW, solar power will help businesses save significantly on operating costs, increase profits and at the same time use clean natural energy, also help to protect the environment, building a “green” brand. “

dien-mat-troi-ap-maiDimension of the 1MW rooftop solar power project at the Dien Bien waste incineration plant

The rooftop solar power system will generate electricity to meet businesses’ operations, thereby helping businesses to reduce purchasing electricity from the national grid. As a result, businesses can reduce electricity costs and increase profits.

dien-mat-troi-ap-maiPhotos during construction were recorded by A Dong ET

The engineers at A Dong Engineering and Technology Co. are always actively constructing, applying the right standards and safety procedures, as well as careful calculations such as:

  • Make sure to install the frame truss with the appropriate height and slope, always carefully consider the plan for waterproofing and anchoring to keep the frame truss …
  • Reasonable calculation of cell frames so that panels are not shaded after installation
  • Properly calculate the roof’s load capacity, wind load capacity in accordance with the local weather conditions and the system’s height …

dien-mat-troi-ap-mai

  • The system is properly grounded and protected against lightning
  • Secure connection points
  • Install and arrange power lines and inverter neatly and safely

dien-mat-troi-ap-mai

Phu My Solar company is the main investor for this solar power plant project, which is built at a waste incineration plant in Điện Biên Province, with a total capacity of up to 1MW.

dien-mat-troi-ap-mai

The solar power project at the plant is designed and installed by A Dong ET on the roof of the plant, with the aim of supplying electricity from solar energy, saving the cost of state electricity, and saving operating costs, as well as helping to reduce greenhouse gas emissions, protecting the environment.

dien-mat-troi-ap-mai

In order for the project to be completed on schedule, A Dong ET’s engineers and staff are always actively constructing, regardless of weather difficulties.

Standard materials, carefully selected

All materials for the solar power system, whether the main or auxiliary materials, are carefully selected from leading domestic and international brands to ensure the quality of the whole system.

dien-mat-troi-ap-mai

Specifically, the conductors, cable lifts and system protection switches are specialized, calculated in accordance with Vietnamese standards (TCVN) on solar power as well as electricity in homes and public constructions.

dien-mat-troi-ap-mai

For example, the battery cord is a dedicated DC wire with a voltage up to 1,500V, MCB 1000V one-way switch, DC-AC layer lightning filter, heated zinc galvanized cable tray, select power cable.

dien-mat-troi-ap-mai

All products have a Certificate of Origin (CO), Certificate of Quality (CQ).

Some pictures of the construction of A Dong ET solar power project at Dien Bien incineration plant:

dien-mat-troi-ap-mai

Một số hình ảnh thi công của Á Đông ET dự án điện mặt trời tại nhà máy đốt rác Điện Biên:

dien-mat-troi-ap-mai dien-mat-troi-ap-maidien-mat-troi-ap-mai dien-mat-troi-ap-mai dien-mat-troi-ap-maidien-mat-troi-ap-maidien-mat-troi-ap-mai

A Dong ET would like to send our sincere thanks to our valued customers and companies that have always trusted and selected us to implement and execute projects. The quality of products as well as the construction efficiency of the company have been proven through real projects, constantly innovating and improving techniques to bring superiority in each project. Please contact us for the best advice!

—————————-

For the best advice on optimal solutions for electricity, please contact:

A Dong Engineering and Technology Co., Ltd (A Dong Entech)

The transaction office: No. 527 – Hoang Hoa Tham Street, Ba Dinh District, Hanoi City

Hotline:0963.239.959

Email: adonget@gmail.com

Leave a Reply

Your email address will not be published. Required fields are marked *

0963239959